How does StockTrim forecast raw materials from finished-goods demand?
- The sale of the finished goods trigger consumption of the raw materials based on the amounts specified in the bill of materials. We then use the raw materials parameters to generate the required reorder recommendation.
How does StockTrim handle multi-level BOMs?
- Every item or stage in a BOM has its own distinct forecast. Sales and consumption at each higher level drives usage at each lower level.
How does StockTrim handle different supplier lead times?
- Currently you must enter a specific lead time for us to use. You can change this at any time.
Can StockTrim forecast new manufactured products?
- Yes StockTrim can generate forecasts for new goods if you do any of the following:
- Link the new finished good to an older product that has sales history that is appropriate
- Or put in your own forecasts for the system to use
Can StockTrim plan component purchases automatically?
- Yes StockTrim will automatically generate forecasts for components based on the parameters given (sales, lead time, moq etc). You can adjust these parameters at any time, and then create purchase orders as needed.
Comments
0 comments
Please sign in to leave a comment.